Find, save and share Public Notices that affect you in the area.
Search the Public Notice Portal What is the Public Notice Portal?What is the Public Notice Portal?
The Public Notice Portal carries statutory public notices published in local newspapers and is the fastest and most effective way of finding out what is happening in YOUR neighbourhood.
Search the Public Notice PortalA controversial £150 million plan to redevelop Falmouth Docks is due to be decided at a meeting of Cornwall Council’s strategic planning committee on Thursday (November 19).
A public protest will take place as councillors arrive to either approve or refuse the proposal.
If approved, the scheme will include new wharves, a new area to build floating offshore windfarms and enhance berth capacity allowing for larger cruise ship visits and increased cargo capacity.
The proposal could see up to 200,000 passengers visit the port every year by 2030, which, in turn, could boost the local economy by an additional £13 million and create more than 350 jobs.
However, the proposal has led to protests, including a public meeting attended by hundreds of residents, and concerns raised over the ecological impacts of dredging the harbour as part of the plan.
Cornwall Wildlife Trust, local fishermen and the Stop the Dredge campaign group are among those concerned about highly toxic pollutants being introduced into the Carrick Roads, Fal Estuary and Falmouth Bay during dredging operations. More than 5,000 people have also signed a petition against the proposal.
The application has also received more than 800 comments on Cornwall Council’s planning portal, with 733 objecting and 102 in support. Those against the redevelopment are also concerned about the impacts of a massive expansion of cruise-ship tourism on air pollution, traffic congestion and the quality of life in Falmouth.
Members of the public will be gathering outside Lys Kernow (County Hall) in Truro from 8.30am on Thursday morning (November 19) to make their feelings known before the planning committee meeting.
The planning application by Balaena (A&P) has been brought before the planning committee this week by local member Cllr Laurie Magowan, due to “the potential impact of the prolonged construction activity on the local highways network and surrounding communities.
“I appreciate improvement and reduction in the potential number of HGV movements has been addressed in the application and proposed conditions but feel this is still significant enough to be reviewed by the strategic planning committee”.
Recommended reading
-
Major Falmouth Docks redevelopment would be largest investment in 70 years
-
Concerns raised over environmental impact of proposed redevelopment of docks
-
Falmouth Docks bosses defend dredging plans amid pollution fears
-
Environment expert wades into Falmouth Docks dredging proposals
-
Fear dredging Falmouth could cause 'catasrophic disaster' for unique marine life
Among the proposed works, FLOW (floating offshore wind) devices would be assembled in the docks before being towed out to sea.
Each FLOW device comprises a floating base which is approximately 170m long by 80m wide. Mounted on top of each base would be two wind turbines. Each turbine would measure 125m to its hub and 230m to blade tip.
The turbine towers and turbines would be lifted into place from the land behind Duchy Wharf by two mobile cranes. Each mobile crane would be approximately 150m in height. There would be a maximum of two FLOW devices in the docks at any one time.
The proposed development would enable larger cruise vessels of up to Excellence class to dock. At present such ships are unable to berth within the docks and are required to anchor in the harbour or Falmouth Bay before passengers are transferred to the docks via tender. Cruise passengers arriving in Falmouth could rise to 200,000 per year, up from 45,557 passenger visits in 2023.
A separate marine licence application is seeking consent for proposed works that would be taking place in the sea and outside Cornwall Council’s jurisdiction, which include the contentious dredging.
The application was recently called back to Falmouth Town Council’s planning committee by request of its members. After some discussion, councillors voted to stand by their previous comments to “recommend approval as the redevelopment and modernisation of the existing infrastructure is necessary to secure the future of the dock”. Councillors added a recommendation “that vehicle movements removing dredged material be managed to a minimum”.
The town council recommended approval in accordance with the precautionary approach advocated by Natural England to ensure scientific safeguards around dredging “are adhered to before, during and after, including assessment of the accuracy of the model to predict the tidal flow and prevent habitat damage”.
Cornwall Council’s planning department has recommended approval with conditions.
Officers noted that the presence of the fully assembled FLOW turbines within the docks would result in “significant adverse landscape, seascape and visual impacts and adverse impacts upon the setting of the Cornwall National Landscape” and would have an “adverse impact on the setting of the nearby designated heritage assets (in particular, the conservation area, scheduled ancient monument and listed buildings) due to their height, scale and visual dominance”.
However, the planning authority added that the turbines would only be within the docks on a temporary basis – for two periods of two weeks over a 10-month period – and that any harm caused should be weighed against the public benefits of the development.
A report to this week’s meeting also notes “there are no alternative locations or alternative designs and layouts for the development that would provide a satisfactory alternative that would achieve the aims of the development and result in lesser adverse impacts on the environment”.
If approved, demolition and construction works are anticipated to last approximately three-and-a-half years.
The strategic planning meeting takes place at 10am on Thursday, November 19, in the council chamber at Lys Kernow (County Hall) in Truro.
Share